Read more about the exciting projects JFTS is involved with worldwide.

Browse our case studies for more information on how we are supporting our customers across a range of markets.

Grid view

20/08/2012
Wind farm ground improvement verification

Logging settlement at a wind farm site using our SLT2 static load test monitoring system.

20/07/2012
Sonic logging in Azerbaijan

Testconsult delivers SCXT3000 sonic logging system and equipment training for Baku metro system construction works.

03/07/2012
Plate load testing at Cammell Laird wind farm facility

Testconsult have carried out 60 plate load tests at Cammell Laird shipyard, one of Europe’s largest wind farm component storage yards.

26/06/2012
Dynamic pile testing on Southend Pier

Testconsult commissioned by Kier London to carry out dynamic pile load testing on existing cast iron piles at Southend Pier.

20/06/2012
Concrete condition survey on Liverpool's waterfront

Testconsult called upon to carry out condition survey of four year old concrete and abandoned steel structure.

19/06/2012
Testconsult perform 1200Te static load test in Azerbaijan

Testconsult were asked to provide a monitoring system capable of measuring the strain at various pile depths whilst under load.

01/06/2012
Cyclic pile testing at Loughborough Grand Central railway

Testconsult take on an ambitious challenge of testing piles under various load cycles to monitor how they react.

01/05/2012
Testconsult provide large scale shear box for Trondheim University

Trondheim University NTNU takes delivery of a SB2010 large scale shear box, designed and manufactured by Testconsult.

05/03/2012
Testconsult complete 440Te offshore pile load test in West Africa

As part of a new project to exploit the mineral wealth Testconsult were invited to perform a 440Te static load test on an offshore test pile.

01/08/2011
Pottery works refurbished in Stoke-on-Trent

Testconsult commissioned by Stoke-on-Trent City Council to carry out structural investigation and materials testing.
BACK TO TOP